Job Overview
This job consisted of approximately 31,040 sf of Concrete with Heated Flooring System for a new build. As a company, we are always on the lookout for new equipment and methods to improve our craft. With this job, one of the newer machines we have was used. The S-840 Laser Screed was utilized for this project due to the ability for adjustment on the screed for the heated floor system.
James K. Coy Construction
303 South Jackson
Lindsborg, KS 67456
785.227.8770
info@jameskcoyconstruction.com